Trending...
- Grammy award-winning Cuban-Canadian artist Alex Cuba releases his 11th studio album, "Indole"
- California: Crime is down in San Francisco, key law enforcement partnerships yield successful results
- $73.6M Pipeline, $10M Crypto Play & Legal Firepower: Why Investors Are Watching Cycurion (N A S D A Q: CYCU) Like a Hawk
PUBLIC NOTICE
INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION
CITY OF SAN JOSE, CALIFORNIA
Project Name: 5853 Rue Ferrari Project
File No.: H21-006 and ER21-022
Description: The proposed project would demolish the two existing warehouse buildings, totaling 289,330 sf, and construct a 302,772 sf tilt-up warehouse building. The project intends to redevelop the property as a modern industrial facility. While no end users have been identified, the building is programmed and designed to attract users such as logistics, e-commerce, warehouse/distribution, wholesaling, industrial services, and light to medium manufacturing. The new warehouse building would contain approximately 292,772 sf of warehouse space and 10,000 sf of office space. Because office space is considered an incidental or ancillary use to the permitted warehouse use, the analysis in this document integrates office space into the primary warehouse use to be consistent with industry standards and municipal code. The office space may serve as additional office/research and design (R&D) space, storage or a variety of other uses. The proposed warehouse building would include 47 loading dock doors for trailer, box, and recycling trucks on the west side of the warehouse building. The proposed project also includes surface parking with 108 trailer truck stalls and 296 automobile stalls on site.
More on The Californer
Location: The 17.38-acre project site is located at 5853 Rue Ferrari in the City of San José.
Assessor's Parcel No.: 678-05-057
Council District: 6
Applicant Contact Information: Duke Realty Corporation (Attn: Randy Dilag); 409 13th Street, Suite 1600, Oakland, CA 94612; 415-994-9769; randy.dilag@dukerealty.com
The City has performed an environmental review of the project. The environmental review examines the nature and extent of any adverse effects on the environment that could occur if the project is approved and implemented. Based on the review, the City has prepared a Draft Mitigated Negative Declaration (MND) for this project. An MND is a statement by the City that the project will not have a significant effect on the environment because the project will include mitigation measures that will reduce identified project impacts to a less than significant level. The project site is not present on any list pursuant to Section 65962.5 of the California Government Code.
More on The Californer
The public is welcome to review and comment on the Draft MND. The public comment period for this Draft MND begins on Wednesday January 19, 2022 and ends on Tuesday February 8, 2022. The Draft MND, Initial Study, and reference documents are available online at: www.sanjoseca.gov/negativedeclarations
In response to the COVID-19 pandemic, hard copies are no longer available at the typical locations such as the City of San José Department of Planning, Building and Code Enforcement, located at City Hall, 200 East Santa Clara Street. Therefore, if requested, a hard copy will be mailed to you. Please allow time for printing and delivery. Please contact Thai-Chau Le at (408) 535-5624, or by e-mail at Thai-Chau.Le@sanjoseca.gov for hard copy request, questions, or concerns.
INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION
CITY OF SAN JOSE, CALIFORNIA
Project Name: 5853 Rue Ferrari Project
File No.: H21-006 and ER21-022
Description: The proposed project would demolish the two existing warehouse buildings, totaling 289,330 sf, and construct a 302,772 sf tilt-up warehouse building. The project intends to redevelop the property as a modern industrial facility. While no end users have been identified, the building is programmed and designed to attract users such as logistics, e-commerce, warehouse/distribution, wholesaling, industrial services, and light to medium manufacturing. The new warehouse building would contain approximately 292,772 sf of warehouse space and 10,000 sf of office space. Because office space is considered an incidental or ancillary use to the permitted warehouse use, the analysis in this document integrates office space into the primary warehouse use to be consistent with industry standards and municipal code. The office space may serve as additional office/research and design (R&D) space, storage or a variety of other uses. The proposed warehouse building would include 47 loading dock doors for trailer, box, and recycling trucks on the west side of the warehouse building. The proposed project also includes surface parking with 108 trailer truck stalls and 296 automobile stalls on site.
More on The Californer
- White House to fire explosive artillery over major roadway in Southern California, I-5 to be temporarily shut down on Saturday due to life safety risk
- Sub-Millisecond Trading Platform: HNZLLQ Introduces Unified Gateway for Philippine Digital Asset Traders
- $2.1B Theft Losses: Bitquore Launches 1M+ TPS Platform with 95% Offline Asset Protection for U.S. Traders
- Ecko Unltd & Nexxlegacy - New Arrivals
- California: Governor Newsom announces appointments
Location: The 17.38-acre project site is located at 5853 Rue Ferrari in the City of San José.
Assessor's Parcel No.: 678-05-057
Council District: 6
Applicant Contact Information: Duke Realty Corporation (Attn: Randy Dilag); 409 13th Street, Suite 1600, Oakland, CA 94612; 415-994-9769; randy.dilag@dukerealty.com
The City has performed an environmental review of the project. The environmental review examines the nature and extent of any adverse effects on the environment that could occur if the project is approved and implemented. Based on the review, the City has prepared a Draft Mitigated Negative Declaration (MND) for this project. An MND is a statement by the City that the project will not have a significant effect on the environment because the project will include mitigation measures that will reduce identified project impacts to a less than significant level. The project site is not present on any list pursuant to Section 65962.5 of the California Government Code.
More on The Californer
- P4 The Network is Officially Launched
- Silva Construction Advises Homeowners on Smart Homes and Integrated Technology
- Cold Released on Vimeo Before Moving to Streaming Channels
- California invests nearly $5 billion for local projects to improve roadways, new alternative transport options
- City of Long Beach to Celebrate Completion of Ramona Park Signature Playground
The public is welcome to review and comment on the Draft MND. The public comment period for this Draft MND begins on Wednesday January 19, 2022 and ends on Tuesday February 8, 2022. The Draft MND, Initial Study, and reference documents are available online at: www.sanjoseca.gov/negativedeclarations
In response to the COVID-19 pandemic, hard copies are no longer available at the typical locations such as the City of San José Department of Planning, Building and Code Enforcement, located at City Hall, 200 East Santa Clara Street. Therefore, if requested, a hard copy will be mailed to you. Please allow time for printing and delivery. Please contact Thai-Chau Le at (408) 535-5624, or by e-mail at Thai-Chau.Le@sanjoseca.gov for hard copy request, questions, or concerns.
0 Comments
Latest on The Californer
- Kiwanis Club of San Ramon Valley Teams With NBC Bay Area, Safeway for Annual Food Drive
- New You Smile Dental Implant Center Expands Office
- $8 Billion High-Margin National Gentlemen's Club Market Targeted by Acquisition Strategy Incorporating the Successful Peppermint Hippo™ Brand: $TRWD
- Why Indian Game Development Companies Are Shaping the Future of Global Gaming
- Cold Storage and Proof-of-Reserves: BTXSGG Launches Institutional-Grade Asset Protection for Filipino Traders
- Why FIRE Enthusiasts Are Buying Businesses Instead of Just Saving Their Way to Freedom
- Meet a Scientologist Powers Rwanda's Digital Connectivity with Venuste Twagiramungu
- All About bail Bonds Expands Presence to Serve Houston Families
- Thousands to Ride to L.A. Children's Hospital This Halloween Night
- Essential Living Support Opens First VA Medical Foster Home in Cheyenne, Wyoming
- Top AI Jobs for Recent College Grads
- City of Long Beach Reports First Human Case of West Nile Virus This Year
- Founder of Threshold Aviation selected as finalist for 2025 Spirit of the Entrepreneur Awards
- City of Long Beach Introduces Interest Form to Connect Local Businesses and Property Owners with 2028 Games Stakeholders
- Six-Figure Chicks Book Series 96 Authors, 6 Volumes Published to Empower and Mentor Women Nationwide
- MTN WTR Partners with Sumo + Sushi 2025 U.S. Tour to Celebrate Japanese Culture Across Five Cities
- Hundreds of new homes for veterans are coming to California through voter-approved Prop 1 funding
- LSC Destruction Launches Cutting-Edge Cryptocurrency Scanning to Hard Drive Destruction Services
- California highlights earthquake preparedness for Great ShakeOut Day
- DALPS Announces Global Airdrop to Reward Users and Expand Its Offers Marketplace