Trending...
- California prioritized fighting organized retail theft, those results are paying off with 36,000 arrests and $293 million in stolen goods recovered - 120
- California and the Australian state of Queensland ink new partnership to accelerate climate resilience, agricultural technology, and innovation - 112
- California's public safety strategy works: Governor Newsom's commitment helps lower crime as new study shows violence prevention saves lives
NOTICE OF AVAILABILITY (NOA) OF A DRAFT ENVIRONMENTAL IMPACT REPORT (EIR) FOR THE
1312 EL PASEO & 1777 SARATOGA AVENUE MIXED-USE VILLAGE PROJECT AND PUBLIC COMMENT PERIOD
Project Description: The project is proposed on two sites and includes a rezoning to support the demolition of the existing structures on the sites totaling approximately 121,600 square feet and the development of one of the following development scenarios:
Non-Education Mixed-Use Option
Under the Non-Education Mixed-Use Option, the proposed uses would be provided in three buildings ranging from eight to 11 stories (up to 145 feet tall). This option would construct up to 1,100 multifamily units and 165,000 square feet of general commercial space.
Education Mixed-Use Option
Under the Education Mixed-Use Option, the proposed uses would be provided in four buildings ranging from seven to 10 stories (up to 130 feet tall). This option would construct up to 730 multifamily units, 66,000 square feet of general commercial space, a K-12 private school, and a 200-room dorm facility.
Location: The project is proposed on a total of approximately 10.7 acres located at the intersection of Saratoga Avenue and Lawrence Expressway/Quito Road in San José. The project consists of two sites:
Council District: 1 File No.: PDC19-049
More on The Californer
The proposed project will have potentially significant environmental effects on Air Quality, Biological Resources, Hazardous Materials, Noise, and Transportation. The California Environmental Quality Act (CEQA) requires this notice to disclose whether any listed toxic sites are present at the project location. The site is not listed on the Cortese List.
The Draft EIR and documents referenced in the Draft EIR are available for review online at the City of San José's "Active EIRs" website at www.sanjoseca.gov/activeeirs.
A hard copy of the of EIR is available for viewing at the Dr. Martin Luther King Jr. Library located at 150 E. San Fernando Street, San Jose, CA 95112 or by appointment at the San José City Hall Permit Center located at 200 E Santa Clara St, San Jose, CA 95113. Should you wish to review a hard copy, please contact by email Maira.Blanco@sanjoseca.gov.
The public review period for this Public Review Draft EIR begins on October 15, 2021 and ends on November 29, 2021. Written comments must be received at the Planning Department by 5:00 p.m. on November 29, 2021 to be addressed as part of the formal EIR review process. Comments and questions should be referred to Maira Blanco in the Department of Planning, Building and Code Enforcement via e-mail: Maira.Blanco@sanjoseca.gov, or by regular mail to:
More on The Californer
Department of Planning, Building, and Code Enforcement
Attn: Maira Blanco
200 East Santa Clara Street, 3rd Floor
San José, CA 95113
For the official record, please your written comment letter and reference File No. PDC19-049.
Following the close of the public review period, the Director of Planning, Building, and Code Enforcement will prepare a Final Environmental Impact Report that will include responses to comments received during the review period. At least ten days prior to the public hearing on the EIR, the City's responses to comments received during the public review period will be available for review and will be sent to those who have commented in writing on the EIR during the public review period.
1312 EL PASEO & 1777 SARATOGA AVENUE MIXED-USE VILLAGE PROJECT AND PUBLIC COMMENT PERIOD
Project Description: The project is proposed on two sites and includes a rezoning to support the demolition of the existing structures on the sites totaling approximately 121,600 square feet and the development of one of the following development scenarios:
Non-Education Mixed-Use Option
Under the Non-Education Mixed-Use Option, the proposed uses would be provided in three buildings ranging from eight to 11 stories (up to 145 feet tall). This option would construct up to 1,100 multifamily units and 165,000 square feet of general commercial space.
Education Mixed-Use Option
Under the Education Mixed-Use Option, the proposed uses would be provided in four buildings ranging from seven to 10 stories (up to 130 feet tall). This option would construct up to 730 multifamily units, 66,000 square feet of general commercial space, a K-12 private school, and a 200-room dorm facility.
Location: The project is proposed on a total of approximately 10.7 acres located at the intersection of Saratoga Avenue and Lawrence Expressway/Quito Road in San José. The project consists of two sites:
- El Paseo (a portion of Assessor Parcel Number [APN] 403-33-014), which is approximately 8.9 acres in size and located at the southeast corner of Saratoga Avenue and Quito Road; and
- 1777 Saratoga Avenue (APNs 386-10-033, -036, -044, -045, and -046), which is approximately 1.8 acres in size and located at the northeast corner of Saratoga Avenue and Lawrence Expressway.
Council District: 1 File No.: PDC19-049
More on The Californer
- Rural California Energy Consultancy Unlocks Remote Sites for Vacation Rentals and ADUs
- Fun and Easy Health Introduces Acupuncture Meridian Wellness Education in Murrieta
- Over 120 Teen Volunteers To Help At 8th Annual Santa Barbara County Farm Day
- Bestselling "Akiti the Hunter" Series Launches National and International Push to Open Libraries
- New Book Brings Decades of Clinical Research to the Addiction Recovery Crisis
The proposed project will have potentially significant environmental effects on Air Quality, Biological Resources, Hazardous Materials, Noise, and Transportation. The California Environmental Quality Act (CEQA) requires this notice to disclose whether any listed toxic sites are present at the project location. The site is not listed on the Cortese List.
The Draft EIR and documents referenced in the Draft EIR are available for review online at the City of San José's "Active EIRs" website at www.sanjoseca.gov/activeeirs.
A hard copy of the of EIR is available for viewing at the Dr. Martin Luther King Jr. Library located at 150 E. San Fernando Street, San Jose, CA 95112 or by appointment at the San José City Hall Permit Center located at 200 E Santa Clara St, San Jose, CA 95113. Should you wish to review a hard copy, please contact by email Maira.Blanco@sanjoseca.gov.
The public review period for this Public Review Draft EIR begins on October 15, 2021 and ends on November 29, 2021. Written comments must be received at the Planning Department by 5:00 p.m. on November 29, 2021 to be addressed as part of the formal EIR review process. Comments and questions should be referred to Maira Blanco in the Department of Planning, Building and Code Enforcement via e-mail: Maira.Blanco@sanjoseca.gov, or by regular mail to:
More on The Californer
- Apple Valley Home Sales Rise 22.0% as Active Listings Fall 20.2%
- Banafsheh Sayyad Offers a Free Sacred Dance Experience to Awaken Focus and Presence
- Long Beach Public Health Laboratory Now Offering Accredited Environmental Lead Testing Services
- French Camp Academy Releases New Video Inviting Individuals to Consider a Life of Service
- Calder Capital's Growth Continues with Expansion into Southern California
Department of Planning, Building, and Code Enforcement
Attn: Maira Blanco
200 East Santa Clara Street, 3rd Floor
San José, CA 95113
For the official record, please your written comment letter and reference File No. PDC19-049.
Following the close of the public review period, the Director of Planning, Building, and Code Enforcement will prepare a Final Environmental Impact Report that will include responses to comments received during the review period. At least ten days prior to the public hearing on the EIR, the City's responses to comments received during the public review period will be available for review and will be sent to those who have commented in writing on the EIR during the public review period.
0 Comments
Latest on The Californer
- Impact & Influence April 2026: Joel Rodriguez Tirado on Renewal,Growth & Uncomfortable Conversations
- Franchise Operators Are Standardizing Compliance Across Every Location in 2026
- Impact & Influence March 2026: Joel Rodriguez Tirado - Why You're Still Waiting & The Power of Start
- New Comparison Helps Senior Travelers Weigh Overseas Adventure Travel Against Road Scholar
- Heritage at Manalapan Welcomes New Sales Team as Luxury Single-Family Home Community Continues to Grow
- Applications Now Open for the 2027 BrightEdge Entrepreneurs Program
- Mandeville Pests May Pose Serious Health Risks for Your Family
- xBxBio Advances Connected Cardiovascular Intelligence With Chapter 2 Release
- Share your workplace safety solutions at 2027 Applied Ergonomics Conference
- Parents No Longer Have to Wait 3 Weeks for a Sleep Consultant: Nora Talks Tonight, Stays for 5 Days, Costs $89
- May The Worst Team Win! Loserball Kicks Off Another NFL Season of Hilarious Mayhem
- Wehb.pro Launches $99 AI Website Builder With No Subscription or Platform Lock-In
- Top 10 AI Trading Robots Beat Market targeting High-Margin Stocks at 155% Annualized Return for Retail Investors (NVDA, USAR)
- Black Women Living With, and Impacted by, HIV Express Gratitude, Grief, Joy, and Resilience
- MainConcept Easy Video API Extends Full Transcoding to Arm and NETINT VPUs
- Boost Board Gives Daily Visibility to Fundraising Campaigns Stuck at Zero
- Hazel-E Celebrates the Premiere of "Keeping Up With Hazel-E" on Wave TV Network
- Talaria E-bike China Source Cuts Talaria Sting MX5 Pro Pricing by $700
- Disruptor Creations Options Untitled Feature Film Written by David Krumholtz and Johnny Markows
- Skin Health Expert and Nurse Practitioner Blossom Inuenwi Launches 'The Glow Brief' Podcast