Trending...
- Governor Gavin Newsom signs SB 27, strengthening California's CARE Act and expanding access to behavioral health services
- Cent Capital Launches FinPedia, a Free Financial Literacy Resource for Personal Finance and Investing
- Mullins McLeod Surges Into SC Governor's Race with $1.4 Million Raised in First Quarter; Most from His Own Commitment, Not Political Pockets
NOTICE OF AVAILABILITY (NOA) OF A DRAFT ENVIRONMENTAL IMPACT REPORT (EIR) FOR THE
1312 EL PASEO & 1777 SARATOGA AVENUE MIXED-USE VILLAGE PROJECT AND PUBLIC COMMENT PERIOD
Project Description: The project is proposed on two sites and includes a rezoning to support the demolition of the existing structures on the sites totaling approximately 121,600 square feet and the development of one of the following development scenarios:
Non-Education Mixed-Use Option
Under the Non-Education Mixed-Use Option, the proposed uses would be provided in three buildings ranging from eight to 11 stories (up to 145 feet tall). This option would construct up to 1,100 multifamily units and 165,000 square feet of general commercial space.
Education Mixed-Use Option
Under the Education Mixed-Use Option, the proposed uses would be provided in four buildings ranging from seven to 10 stories (up to 130 feet tall). This option would construct up to 730 multifamily units, 66,000 square feet of general commercial space, a K-12 private school, and a 200-room dorm facility.
Location: The project is proposed on a total of approximately 10.7 acres located at the intersection of Saratoga Avenue and Lawrence Expressway/Quito Road in San José. The project consists of two sites:
Council District: 1 File No.: PDC19-049
More on The Californer
The proposed project will have potentially significant environmental effects on Air Quality, Biological Resources, Hazardous Materials, Noise, and Transportation. The California Environmental Quality Act (CEQA) requires this notice to disclose whether any listed toxic sites are present at the project location. The site is not listed on the Cortese List.
The Draft EIR and documents referenced in the Draft EIR are available for review online at the City of San José's "Active EIRs" website at www.sanjoseca.gov/activeeirs.
A hard copy of the of EIR is available for viewing at the Dr. Martin Luther King Jr. Library located at 150 E. San Fernando Street, San Jose, CA 95112 or by appointment at the San José City Hall Permit Center located at 200 E Santa Clara St, San Jose, CA 95113. Should you wish to review a hard copy, please contact by email Maira.Blanco@sanjoseca.gov.
The public review period for this Public Review Draft EIR begins on October 15, 2021 and ends on November 29, 2021. Written comments must be received at the Planning Department by 5:00 p.m. on November 29, 2021 to be addressed as part of the formal EIR review process. Comments and questions should be referred to Maira Blanco in the Department of Planning, Building and Code Enforcement via e-mail: Maira.Blanco@sanjoseca.gov, or by regular mail to:
More on The Californer
Department of Planning, Building, and Code Enforcement
Attn: Maira Blanco
200 East Santa Clara Street, 3rd Floor
San José, CA 95113
For the official record, please your written comment letter and reference File No. PDC19-049.
Following the close of the public review period, the Director of Planning, Building, and Code Enforcement will prepare a Final Environmental Impact Report that will include responses to comments received during the review period. At least ten days prior to the public hearing on the EIR, the City's responses to comments received during the public review period will be available for review and will be sent to those who have commented in writing on the EIR during the public review period.
1312 EL PASEO & 1777 SARATOGA AVENUE MIXED-USE VILLAGE PROJECT AND PUBLIC COMMENT PERIOD
Project Description: The project is proposed on two sites and includes a rezoning to support the demolition of the existing structures on the sites totaling approximately 121,600 square feet and the development of one of the following development scenarios:
Non-Education Mixed-Use Option
Under the Non-Education Mixed-Use Option, the proposed uses would be provided in three buildings ranging from eight to 11 stories (up to 145 feet tall). This option would construct up to 1,100 multifamily units and 165,000 square feet of general commercial space.
Education Mixed-Use Option
Under the Education Mixed-Use Option, the proposed uses would be provided in four buildings ranging from seven to 10 stories (up to 130 feet tall). This option would construct up to 730 multifamily units, 66,000 square feet of general commercial space, a K-12 private school, and a 200-room dorm facility.
Location: The project is proposed on a total of approximately 10.7 acres located at the intersection of Saratoga Avenue and Lawrence Expressway/Quito Road in San José. The project consists of two sites:
- El Paseo (a portion of Assessor Parcel Number [APN] 403-33-014), which is approximately 8.9 acres in size and located at the southeast corner of Saratoga Avenue and Quito Road; and
- 1777 Saratoga Avenue (APNs 386-10-033, -036, -044, -045, and -046), which is approximately 1.8 acres in size and located at the northeast corner of Saratoga Avenue and Lawrence Expressway.
Council District: 1 File No.: PDC19-049
More on The Californer
- Pacific Harbor Line Expands Sustainability Efforts with Remora Partnership
- NASA Agreements, New Ocean Exploration Applications Added to Partnerships with Defiant Space Corp and Emtel Energy USA for Solar Tech Leader: $ASTI
- Chic and Secure: The Blue Luna Debuts Stylish Keychains with Purpose
- BEC Technologies Showcases Leadership in Private Broadband Ecosystem with Inclusion in UTC's Ecosystem Summary Report
- Voices for Humanity Scouts a Brighter Future for Brazil's Youth with Chief Marcos Santos Jr
The proposed project will have potentially significant environmental effects on Air Quality, Biological Resources, Hazardous Materials, Noise, and Transportation. The California Environmental Quality Act (CEQA) requires this notice to disclose whether any listed toxic sites are present at the project location. The site is not listed on the Cortese List.
The Draft EIR and documents referenced in the Draft EIR are available for review online at the City of San José's "Active EIRs" website at www.sanjoseca.gov/activeeirs.
A hard copy of the of EIR is available for viewing at the Dr. Martin Luther King Jr. Library located at 150 E. San Fernando Street, San Jose, CA 95112 or by appointment at the San José City Hall Permit Center located at 200 E Santa Clara St, San Jose, CA 95113. Should you wish to review a hard copy, please contact by email Maira.Blanco@sanjoseca.gov.
The public review period for this Public Review Draft EIR begins on October 15, 2021 and ends on November 29, 2021. Written comments must be received at the Planning Department by 5:00 p.m. on November 29, 2021 to be addressed as part of the formal EIR review process. Comments and questions should be referred to Maira Blanco in the Department of Planning, Building and Code Enforcement via e-mail: Maira.Blanco@sanjoseca.gov, or by regular mail to:
More on The Californer
- $500,000 in Stock Dividend for Shareholders in 2025 Sweetens The Pot on Success of Becoming Debt Free with No Convertible Notes or Warrants for $IQST
- Milwaukee Job Corps Center: Essential Workforce Training—Admissions Now Open
- Aissist.io Launches Hybrid AI Workforce to Solve AI Pilot Failure for Customer Support Automation
- Christy Sports Makes Snowsports More Accessible for Families to Get Outside Together
- MainConcept Completes Management Buyout to Become Independent Company
Department of Planning, Building, and Code Enforcement
Attn: Maira Blanco
200 East Santa Clara Street, 3rd Floor
San José, CA 95113
For the official record, please your written comment letter and reference File No. PDC19-049.
Following the close of the public review period, the Director of Planning, Building, and Code Enforcement will prepare a Final Environmental Impact Report that will include responses to comments received during the review period. At least ten days prior to the public hearing on the EIR, the City's responses to comments received during the public review period will be available for review and will be sent to those who have commented in writing on the EIR during the public review period.
0 Comments
Latest on The Californer
- For Nat'l. Novel Writing Month: Check out The Next Big Thing in Entertainment for Books, Movies & TV
- MetroWest wellness: Holliston farmhouse spa unveils Centerpoint Studio
- California: Governor Newsom proclaims Indigenous Peoples' Day
- Nomadness Offices Now available in Mammoth Lakes and Steamboat Springs
- Super ChatGPT Hack - No Coding Required! 10X Your Income (Learning) with this Amazing ChatGPT Sec
- Cancer Survivor Roslyn Franken Marks 30-Year Milestone with Empowering Gift for Women
- ICYMI: Governor Newsom congratulates California Nobel laureates, underscoring the state's global dominance in science and innovation
- Hard Hitting Political Issues Column in Noted African American Newspaper Now Facebook Livestreamed
- Record-breaking quarter: California reaches historic high in ZEV sales
- To Make His New Album, a Musician Became an AI. Hear the First Result: Machine
- ENERGY33 Successfully Completes Second Engineering & Construction Management Contract for a 27MW STX Cogeneration Power Plant in Honduras
- Florida International University: "Psychiatry: An Industry of Death" Traveling Exhibit Educates Students on Mental Health Abuse
- Governor Newsom signs bills to further strengthen California's leadership in protecting children online
- SAEN Ranked Among the Top 5 Bay Area Artists of 2025 — Just Behind Easton Cain
- CCHR: VA's Psychiatric Treatments Betray Veterans, Fuel Suicide and Death
- Integris Composites Named Armor Partner for U.S. Army's XM30 Combat Vehicle
- Limited Time: Get $50 Off Water Heater Replacement or Installation from Curoso Plumbing
- Viewing Figures: Soap Opera Insights and Viewership
- Destination: Scientology, Del Valle Celebrates the Cultural Heritage of Mexico
- Jaipur Countryside, 4-Star Comfort: $199 for Two— All-Inclusive with Meals + Transfers at Heritage Hotel Savista