Trending...
- Update Any Sign Instantly with Santek EZ Sign NFC: Ultra-Slim 4-Color E-Paper Display - 514
- California Student Aid Commission Launches 2026-27 Statewide Financial Aid Cycle at Ventura College
- MDRN MUSE Expands Insurance Network Coverage to Include Delta Dental & Cigna
Notice to CEQA Posting:
Our Lady of La Vang Church Project
The City of San José has prepared an Addendum to the Final Initial Study/Mitigated Negative Declaration for the Our Lady of La Vang Church Project (C14-061, SP15-004, HP15-001) for:
Project File No. and Name: SP19-028/HP19-009 – Our Lady of La Vang Church Project
Location: The project site is located at 389 East Santa Clara Street, between North Eighth Street and North Ninth Street.
The Addendum is posted on the City's website at: www.sanjoseca.gov/negativedeclarations
Project Description: A Special Use Permit for the construction of a new church building with a bell pavilion, utility building, and expanded on-site parking on the 2.8-acre project. The proposed church and bell pavilion would total 17,660 square feet with a maximum seating capacity of approximately 1,240 occupants. The maximum height of the church will reach 47 feet above ground level. The 1,250 square foot utility building would house the restrooms, bicycle parking and a trash enclosure. The project also proposes an approximately 10,500 square foot outdoor gathering space which would consist of a courtyard/meditation area, a 27-foot tall statue. and a lawn utilized as a gathering area. The project would remove 43 existing trees and provide new landscaping. An additional 22 parking spaces will be added to the ground-level surface parking lot. Metal fencing would be located along the perimeter of the gathering and meditation areas.
More on The Californer
Upcoming Public Hearing:
If you have any questions, please contact the Environmental Project Manager below:
Bethelhem Telahun
(408)535-5624
bethelhem.telahun@sanjoseca.gov
Our Lady of La Vang Church Project
The City of San José has prepared an Addendum to the Final Initial Study/Mitigated Negative Declaration for the Our Lady of La Vang Church Project (C14-061, SP15-004, HP15-001) for:
Project File No. and Name: SP19-028/HP19-009 – Our Lady of La Vang Church Project
Location: The project site is located at 389 East Santa Clara Street, between North Eighth Street and North Ninth Street.
The Addendum is posted on the City's website at: www.sanjoseca.gov/negativedeclarations
Project Description: A Special Use Permit for the construction of a new church building with a bell pavilion, utility building, and expanded on-site parking on the 2.8-acre project. The proposed church and bell pavilion would total 17,660 square feet with a maximum seating capacity of approximately 1,240 occupants. The maximum height of the church will reach 47 feet above ground level. The 1,250 square foot utility building would house the restrooms, bicycle parking and a trash enclosure. The project also proposes an approximately 10,500 square foot outdoor gathering space which would consist of a courtyard/meditation area, a 27-foot tall statue. and a lawn utilized as a gathering area. The project would remove 43 existing trees and provide new landscaping. An additional 22 parking spaces will be added to the ground-level surface parking lot. Metal fencing would be located along the perimeter of the gathering and meditation areas.
More on The Californer
- BGMgirl Hair Halloween Wig Sale-Up To 60% OFF
- Yeliz Obergfell's SkillFront Sets a New Global Certification Standard with the World's First Verifiable Name-Engraved Digital Badges
- 'Wild Hermit Wellness' Has Achieved Bestseller Status in Just 2 Months Since Launch Of Organic Skincare Line
- California: Governor Newsom announces appointments 10.24.25
- Cal State LA named Pathway Champion for advancing equitable transfer pathways
Upcoming Public Hearing:
- Historic Landmarks Commission, March 3, 2021 at 6:30 PM
- Agendas and instructions for this meeting are posted 7 days prior at:
https://www.sanjoseca.gov/planningmeetings
- Agendas and instructions for this meeting are posted 7 days prior at:
- Planning Director Hearing, March 17, 2021 at 9:00 AM
- Agendas and instructions for this meeting are posted 7 days prior at: https://www.sanjoseca.gov/planningmeetings
If you have any questions, please contact the Environmental Project Manager below:
Bethelhem Telahun
(408)535-5624
bethelhem.telahun@sanjoseca.gov
0 Comments
Latest on The Californer
- California: Governor's SAFE Task Force and local partners clear homeless encampments in Fresno and San Diego
- Hypnotic Hijinks of HypnoMarc Rolls into Sunnyvale for One Night Only
- California: Governor Newsom announces appointments 10.22.25
- California: Governor Newsom announces appointments 10.23.2025
- Lokal Media House Earns ServiceTitan Certified Marketer Status
- Wall Street's New Obsession? Tradewinds Aims to Revolutionize the $8B Gentlemen's Club Industry with National Peppermint Hippo™ Strategy $TRWD
- Poised for Major Growth with Strategic Military Orders, Global Expansion, and Groundbreaking Underground Mining Initiative $RMXI
- Tax Stack AI Founder Rachel Farris, Featured in Accounting Today on Solving the Accounting Pipeline
- PODS® and Cumulus Radio Announce Winner of "Imagine the PODS-ibilities" Contest
- Top Desi Indian Realtors Helping Indian Home Buyers and Sellers in Southern California
- Save the Date! Long Beach's 71st Annual Daisy Lane Parade Returns December 13
- Top Lake Elsinore, CA Realtors for First Time Home Buyers & Sellers | Lake Elsinore Real Estate
- New Children's Picture Book Celebrates Lao American Family, Food & Heritage
- XRP fever is coming again, WOA Crypto helps the new trend and earns tens of thousands of dollars a day
- Molly T. Kennedy Brings Message of Confidence to San Diego Students With Disabilities
- Inflation Rebounds Under Tariff Shadow: Wall Street Veteran Kieran Winterbourne Says Macro Signals Matter More Than Market Sentiment
- NAD Precursor Supplements, Dr. Abhay Kumar Pati, Physician, Researcher, Scientist, Author, USA
- Hero Real Estate Unveils One-Acre Luxury Listing in Atwater Designed for Buyers Seeking Space
- Mensa Foundation's New Science Program Encourages Hands-On Discovery
- THINKWARE Unveils U3000 PRO: Flagship 4K/2K Dash Cam With Dual RADAR and Next-Gen Connected Services