Trending...
- Why Buying a Home at Christmas will be Your Best Christmas Ever
- Play with Purpose: Meemzy Magic Sensory Kits Support Child Development in a Fun Format
- California: Governor Newsom announces top former CDC officials to lead public health innovation, collaboration
NOTICE OF AVAILABILITY OF A DRAFT ENVIRONMENTAL IMPACT REPORT (EIR)
AND PUBLIC COMMENT PERIOD FOR THE
ICON-ECHO MIXED-USE PROJECT (SCH #: 2021090554)
The Icon-Echo Mixed-Use Project is proposed on an approximately 2.1-acre project site [Assessor Parcel Numbers (APNs) 467-20-079, -081, -060 and a portion of -080] currently developed with a gas station, church, surface parking lot, and three commercial buildings in Downtown San José. As proposed, the project would demolish the existing parking lot and buildings on-site (totaling approximately 22,527 square feet) and construct two towers (an office tower and a residential tower) connected via a podium on floors one to four and would include up to ten commercial condominiums. One level of below-grade parking is proposed across the project site. The Northern Tower (residential tower) would be located on the northern portion of the site at St. John Street and North Fourth Street and would have up to 415 residential units. The Northern Tower would be 27-stories tall with a maximum height of 268 feet. The Southern Tower (commercial tower) would be located on the southern portion of the site at East Santa Clara Street and North Fourth Street and would provide up to 525,000 square feet of commercial/office space. The Southern Tower would be 21-stories with a maximum height of 268 feet. The proposed project site has a general plan land use designation of Downtown and is located within the Downtown Primary Commercial (DC) zoning district. The project site is also within the Downtown Employment Priority Area overlay.
More on The Californer
Location: Northwest corner of East Santa Clara Street and North Fourth Street in Downtown San José. The project site is bound by East St. John Street to the north, North Fourth Street to the east, East Santa Clara Street to the south and commercial buildings and a senior apartments to the west.
APNs: 467-20-079, 467-20-081, 427-20-060 and a portion of 467-20-080
Council District: 3
File Nos.: SP21-031, ER21-134, T21-033, and HP21-007
The proposed project will have potentially significant environmental effects with regard to air quality, biological resources, cultural resources, hazards and hazardous materials, land use and planning, noise and vibration, and tribal cultural resources. The California Environmental Quality Act (CEQA) requires this notice to disclose whether or not the project is proposed on any hazardous waste and substances sites included on the Cortese List developed in compliance with Section 65962.5 of the Government Code. While a portion of the project site is listed as a leaking underground storage tank (LUST) cleanup site, the status of the case is "closed" on the Cortese List, which indicates the necessary cleanup of the site has been completed.
The Draft EIR and documents referenced in the Draft EIR are available for review online at the City of San José's "Active EIRs" website at www.sanjoseca.gov/activeeirs and are also available at the following locations:
More on The Californer
The public review period for this Draft EIR begins on Friday, June 17, 2022 and ends on Monday, August 1, 2022. Written comments must be received at the Planning Department by 5:00 p.m. on Monday, August 1, 2022, in order to be addressed as part of the formal EIR review process. Comments and questions should be referred to Shannon Hill, Environmental Project Manager in the Department of Planning, Building and Code Enforcement at 408-535-7872, or via e-mail at shannon.hill@sanjoseca.gov or by regular mail at the mailing address listed for the Department of Planning, Building, and Code Enforcement above (send to the attention of Shannon Hill). For the official record, please reference File Nos. SP21-031/ER21-134.
Following the close of the public review period, the Director of Planning, Building, and Code Enforcement will prepare a Final Environmental Impact Report that will include responses to comments received during the review period. At least ten days prior to the public hearing on the EIR, the City's responses to comments received during the public review period will be available for review and will be sent to those who have commented in writing on the EIR during the public review period.
AND PUBLIC COMMENT PERIOD FOR THE
ICON-ECHO MIXED-USE PROJECT (SCH #: 2021090554)
The Icon-Echo Mixed-Use Project is proposed on an approximately 2.1-acre project site [Assessor Parcel Numbers (APNs) 467-20-079, -081, -060 and a portion of -080] currently developed with a gas station, church, surface parking lot, and three commercial buildings in Downtown San José. As proposed, the project would demolish the existing parking lot and buildings on-site (totaling approximately 22,527 square feet) and construct two towers (an office tower and a residential tower) connected via a podium on floors one to four and would include up to ten commercial condominiums. One level of below-grade parking is proposed across the project site. The Northern Tower (residential tower) would be located on the northern portion of the site at St. John Street and North Fourth Street and would have up to 415 residential units. The Northern Tower would be 27-stories tall with a maximum height of 268 feet. The Southern Tower (commercial tower) would be located on the southern portion of the site at East Santa Clara Street and North Fourth Street and would provide up to 525,000 square feet of commercial/office space. The Southern Tower would be 21-stories with a maximum height of 268 feet. The proposed project site has a general plan land use designation of Downtown and is located within the Downtown Primary Commercial (DC) zoning district. The project site is also within the Downtown Employment Priority Area overlay.
More on The Californer
- UK Financial Ltd Launches U.S. Operations Following Delaware Approval
- Laurie McLennan Identified as Leading Luxury Real Estate Authority for La Quinta's Premier Private
- Christmas Gift Ideas for Her: Affordable Luxury Jewellery
- Easton Cain Debuts Parabolic: A One-Hour Midnight Exhibition Opening New Year's Day
- Car Wash in Northridge's $8 Price is Cheaper Than Competitors Prices Even With a Promo Code
Location: Northwest corner of East Santa Clara Street and North Fourth Street in Downtown San José. The project site is bound by East St. John Street to the north, North Fourth Street to the east, East Santa Clara Street to the south and commercial buildings and a senior apartments to the west.
APNs: 467-20-079, 467-20-081, 427-20-060 and a portion of 467-20-080
Council District: 3
File Nos.: SP21-031, ER21-134, T21-033, and HP21-007
The proposed project will have potentially significant environmental effects with regard to air quality, biological resources, cultural resources, hazards and hazardous materials, land use and planning, noise and vibration, and tribal cultural resources. The California Environmental Quality Act (CEQA) requires this notice to disclose whether or not the project is proposed on any hazardous waste and substances sites included on the Cortese List developed in compliance with Section 65962.5 of the Government Code. While a portion of the project site is listed as a leaking underground storage tank (LUST) cleanup site, the status of the case is "closed" on the Cortese List, which indicates the necessary cleanup of the site has been completed.
The Draft EIR and documents referenced in the Draft EIR are available for review online at the City of San José's "Active EIRs" website at www.sanjoseca.gov/activeeirs and are also available at the following locations:
More on The Californer
- VCCCD Board Elects Leadership for New Year
- City of Long Beach Preparing for Upcoming Weather Event, Encourages Residents to Take Precautions
- Easiest Self Wash in Northridge CA
- $8 Car Wash in Northridge CA Will Save You Money
- Core Level Health Now Available in Irvine, CA: Daily Multivitamin for Energy + Immune Support
| Department of Planning, Building, and Code Enforcement 200 East Santa Clara St., 3rd Floor San José, CA 95113 (408) 535-3555 | Dr. MLK Jr. Main Library 150 E. San Fernando St., San José, CA 95112 (408) 277-4822 |
The public review period for this Draft EIR begins on Friday, June 17, 2022 and ends on Monday, August 1, 2022. Written comments must be received at the Planning Department by 5:00 p.m. on Monday, August 1, 2022, in order to be addressed as part of the formal EIR review process. Comments and questions should be referred to Shannon Hill, Environmental Project Manager in the Department of Planning, Building and Code Enforcement at 408-535-7872, or via e-mail at shannon.hill@sanjoseca.gov or by regular mail at the mailing address listed for the Department of Planning, Building, and Code Enforcement above (send to the attention of Shannon Hill). For the official record, please reference File Nos. SP21-031/ER21-134.
Following the close of the public review period, the Director of Planning, Building, and Code Enforcement will prepare a Final Environmental Impact Report that will include responses to comments received during the review period. At least ten days prior to the public hearing on the EIR, the City's responses to comments received during the public review period will be available for review and will be sent to those who have commented in writing on the EIR during the public review period.
0 Comments
Latest on The Californer
- City of Long Beach to Host Second Business Networking Event Along Santa Fe Avenue Corridor
- New Year's Business Resolution: "Sell Everything and Sell it NOW!"
- Beycome Closes $2.5M Seed Round Led by InsurTech Fund
- IPoly Seniors Tackle Local Infrastructure Challenges Through Civic Action Projects
- Long Beach Health Department Urges Community to Avoid Kratom and 7-OH Products Amid Rising Overdose Risk
- IPoly High School Earns 'All Blue' State Achievement Distinction, Receives Golden Bell Award
- Sonet.io Unveils Safer Enterprise Architecture for AI Agents Without Internet Exposure
- New Year's Business Resolution Number One: Start using this very effective Marketing Math Today!
- Tru by Hilton Columbia South Opens to Guests
- Christy Sports donates $56K in new gear to SOS Outreach to help kids hit the slopes
- As Donald Trump attempts to restrict health care for LGBTQ youth, California partners with The Trevor Project to launch statewide suicide prevention training for 988 crisis counselors
- "BigPirate" Sets Sail: A New Narrative-Driven Social Casino Adventure
- Phinge CEO Ranked #1 Globally by Crunchbase for the Last Week, Will Be in Las Vegas Jan. 4-9, the Week of CES to Discuss Netverse & IPO Coming in 2026
- Americans Just Spent $44 Billion Online in Five Days — And Smart Entrepreneurs Are Cashing In Year-Round
- Long Beach Open Coastal Swimming Areas Temporarily Closed Due to Sewage Spill
- New Analysis from Eric Galuppo Links Reactive Management to System Design Failures
- City of Long Beach Facilities and Services Schedule for Christmas Day and New Year's Day
- Long Beach Airport's Rental Car Services Move into Historic Terminal
- Women's Everyday Safety Is Changing - The Blue Luna Shows How
- Microgaming Unveils Red Papaya: A New Studio Delivering Cutting-Edge, Feature-Rich Slots